{"id":2726,"date":"2026-07-27T14:49:03","date_gmt":"2026-07-27T11:49:03","guid":{"rendered":"https:\/\/athorya.com\/?p=2726"},"modified":"2026-07-27T14:49:03","modified_gmt":"2026-07-27T11:49:03","slug":"key-fidic-legal-terms2","status":"publish","type":"post","link":"https:\/\/athorya.com\/ar\/key-fidic-legal-terms2\/","title":{"rendered":"Key FIDIC Legal Terms (Basic to Any Engineering Project) 2"},"content":{"rendered":"<h3>Key <a href=\"https:\/\/www.facebook.com\/share\/p\/17wsSUpkfy\/\" target=\"_blank\" rel=\"noopener\">FIDIC<\/a> Legal Terms (Basic to Any Engineering Project) 2<\/h3>\n<p>1- Provisional Sum: An amount allocated for work not specified in the contract, to be disbursed according to the engineer&#8217;s instructions.<\/p>\n<p>2- Daywork: A payment method based on time, materials, and equipment used, not on fixed prices.<\/p>\n<p>3- Unforeseeable Conditions: Field conditions that could not have been anticipated when the bid was submitted (such as unexpected soil layers).<\/p>\n<p>4- Liquidated Damages: Predetermined amounts imposed on the contractor for delays in completion.<\/p>\n<p>5- Subcontractor: A contractor who performs part of the work under the responsibility of the main contractor.<\/p>\n<p>6- Quality Assurance: A management system that ensures the work is carried out according to specifications and standards.<\/p>\n<p>7- Safety Plan: A mandatory document that specifies safety procedures on site to protect workers and equipment.<\/p>\n<p>8- Method Statement: A document in which the contractor explains how each item of work will be carried out step by step.<\/p>\n<p>9. Shop Drawings: Detailed plans provided by the contractor showing the work details for all disciplines.<\/p>\n<p>10. As-Built Drawings: Drawings showing the actual state of the work after completion, submitted upon final acceptance.<\/p>","protected":false},"excerpt":{"rendered":"<p>Key FIDIC Legal Terms (Basic to Any Engineering Project) 2 1- Provisional Sum: An amount allocated for work not specified in the contract, to be disbursed according to the engineer&#8217;s instructions. 2- Daywork: A payment method based on time, materials, and equipment used, not on fixed prices. 3- Unforeseeable Conditions: Field conditions that could not &hellip;<\/p>","protected":false},"author":1,"featured_media":2727,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[382],"tags":[397,383,396,393,384,398],"class_list":["post-2726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-did-u-know","tag-as-built-drawingstor","tag-fidic","tag-subcontrac","tag-terms","tag-384","tag-398"],"_links":{"self":[{"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/posts\/2726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/comments?post=2726"}],"version-history":[{"count":1,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/posts\/2726\/revisions"}],"predecessor-version":[{"id":2728,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/posts\/2726\/revisions\/2728"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/media\/2727"}],"wp:attachment":[{"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/media?parent=2726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/categories?post=2726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/athorya.com\/ar\/wp-json\/wp\/v2\/tags?post=2726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}